EV Charge Calculator

Ford F-150 Lightning Lariat ER Charging Cost in Canada

By mht-dev, Frontend Engineer & Creator

Estimate the cost and time to charge a Ford F-150 Lightning Lariat ER (full battery electric vehicle / BEV) in Canada, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.

Ford F-150 Lightning Lariat ER specifications

Units
Usable battery capacity
131 kWh
DC fast-charge power (peak)
150 kW
AC charge power (onboard)
11.5 kW
Manufacturer-claimed range
515 km (EPA)
Realistic range estimate
515 km

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
25 kWh/100 km

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
$4.32
Battery chemistry
NMC
Open in calculatorCompare cars

Ford F-150 Lightning Lariat ER charging cost & time

Ford F-150 Lightning Lariat ER charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%78.6 kWh38 minutes$35.37
Public DC 0% → 100%131 kWh1 hours 35 minutes$58.95
At home (AC) 20% → 80%78.6 kWh6 hours 50 minutes$13.36

Ford F-150 Lightning Lariat ER charging time by charger power

How long the Ford F-150 Lightning Lariat ER takes to charge at different charger power levels, capped by its own onboard limits.

Ford F-150 Lightning Lariat ER charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%59 hours 33 minutes
Home wallbox7 kW0% → 100%18 hours 43 minutes
Public AC11.5 kW0% → 100%11 hours 23 minutes
DC fast150 kW10% → 80%43 minutes

AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.

The DC fast row (10% to 80%) models the charging curve tapering as the battery fills, so it is more realistic than a flat estimate. Real DC times still vary with temperature, battery state, and the charger.

Charging speed

The Ford F-150 Lightning Lariat ER is estimated to charge from 20% to 80% on public DC fast charging in about 38 minutes (ultra-fast DC).

Estimated. Real DC charging slows as the battery fills, so the time varies by model, temperature, and charger.

As of 2026-06-04

Battery care

This car uses an NMC battery. For daily use, charging to about 80% and topping up to 100% only before long trips helps it last longer; heat is the main thing that ages it.

Savings vs a petrol car

This charge adds about 309 km of range for $35.37. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 cc$32.80-$2.57
1000–1500 cc$38.76$3.39
1500–2000 cc$47.71$12.34
2000–2500 cc$56.66$21.29
> 2500 cc$68.58$33.21

Estimated from typical combined fuel use by engine size and Regular unleaded at $1.93/L. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Frequently asked questions

How much does it cost to charge a Ford F-150 Lightning Lariat ER from 20% to 80%?

Charging a Ford F-150 Lightning Lariat ER from 20% to 80% at a public DC fast charger costs about $35.37.

How long does it take to charge a Ford F-150 Lightning Lariat ER?

Charging a Ford F-150 Lightning Lariat ER from 20% to 80% at a public DC fast charger takes about 38 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator