EV Charge Calculator

Genesis GV60 Standard RWD Charging Cost in Canada

By mht-dev, Frontend Engineer & Creator

Estimate the cost and time to charge a Genesis GV60 Standard RWD (full battery electric vehicle / BEV) in Canada, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.

Genesis GV60 Standard RWD specifications

Units
Usable battery capacity
80 kWh
DC fast-charge power (peak)
350 kW
AC charge power (onboard)
11 kW
Manufacturer-claimed range
481 km (EPA)
Realistic range estimate
481 km

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
17 kWh/100 km

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
$2.83
Battery chemistry
NMC
Open in calculatorCompare cars

Genesis GV60 Standard RWD charging cost & time

Genesis GV60 Standard RWD charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%48 kWh15 minutes$21.60
Public DC 0% → 100%80 kWh38 minutes$36.00
At home (AC) 20% → 80%48 kWh4 hours 22 minutes$8.16

Genesis GV60 Standard RWD charging time by charger power

How long the Genesis GV60 Standard RWD takes to charge at different charger power levels, capped by its own onboard limits.

Genesis GV60 Standard RWD charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%36 hours 22 minutes
Home wallbox7 kW0% → 100%11 hours 26 minutes
Public AC11 kW0% → 100%7 hours 16 minutes
DC fast350 kW10% → 80%17 minutes

AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.

The DC fast row (10% to 80%) is anchored to a measured charging time for this model, so it reflects the real charging curve. Times still vary with temperature and conditions.

Charging speed

Based on measured data, the Genesis GV60 Standard RWD charges 10% → 80% on DC fast charging in about 17 minutes, peaking at around 263 kW. ev-DB car/3236-class (measured 263, mfr 350).

The Genesis GV60 Standard RWD is estimated to charge from 20% to 80% on public DC fast charging in about 15 minutes (ultra-fast DC).

As of 2026-06-04

Battery care

This car uses an NMC battery. For daily use, charging to about 80% and topping up to 100% only before long trips helps it last longer; heat is the main thing that ages it.

Savings vs a petrol car

This charge adds about 289 km of range for $21.60. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 cc$30.63$9.03
1000–1500 cc$36.20$14.60
1500–2000 cc$44.56$22.96
2000–2500 cc$52.91$31.31
> 2500 cc$64.05$42.45

Estimated from typical combined fuel use by engine size and Regular unleaded at $1.93/L. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Frequently asked questions

How much does it cost to charge a Genesis GV60 Standard RWD from 20% to 80%?

Charging a Genesis GV60 Standard RWD from 20% to 80% at a public DC fast charger costs about $21.60.

How long does it take to charge a Genesis GV60 Standard RWD?

Charging a Genesis GV60 Standard RWD from 20% to 80% at a public DC fast charger takes about 15 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator