EV Charge Calculator

Tesla Model Y Long Range AWD Charging Cost in Indonesia

By mht-dev, Frontend Engineer & Creator

Estimate the cost and time to charge a Tesla Model Y Long Range AWD (full battery electric vehicle / BEV) in Indonesia, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.

Tesla Model Y Long Range AWD specifications

Units
Usable battery capacity
75 kWh
DC fast-charge power (peak)
250 kW
AC charge power (onboard)
11 kW
Manufacturer-claimed range
600 km (WLTP)
Realistic range estimate
510 km

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
15 kWh/100 km

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
Rp 24.993,09
Battery chemistry
NMC
Open in calculatorCompare cars

Tesla Model Y Long Range AWD charging cost & time

Tesla Model Y Long Range AWD charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%45 kWh25 minutesRp 110.970,00
Public DC 0% → 100%75 kWh1 hours 2 minutesRp 184.950,00
At home (AC) 20% → 80%45 kWh4 hours 5 minutesRp 76.478,85

Tesla Model Y Long Range AWD charging time by charger power

How long the Tesla Model Y Long Range AWD takes to charge at different charger power levels, capped by its own onboard limits.

Tesla Model Y Long Range AWD charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%34 hours 5 minutes
Home wallbox7 kW0% → 100%10 hours 43 minutes
Public AC11 kW0% → 100%6 hours 49 minutes
DC fast250 kW10% → 80%28 minutes

AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.

The DC fast row (10% to 80%) is anchored to a measured charging time for this model, so it reflects the real charging curve. Times still vary with temperature and conditions.

Charging speed

Based on measured data, the Tesla Model Y Long Range AWD charges 10% → 80% on DC fast charging in about 28 minutes, peaking at around 250 kW. NMC pack peaks ~250 kW on V3+ Superchargers.

The Tesla Model Y Long Range AWD is estimated to charge from 20% to 80% on public DC fast charging in about 25 minutes (ultra-fast DC).

As of 2026-05-26

Battery care

This car uses an NMC battery. For daily use, charging to about 80% and topping up to 100% only before long trips helps it last longer; heat is the main thing that ages it.

Savings vs a petrol car

This charge adds about 306 km of range for Rp 110.970,00. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 ccRp 207.009,00Rp 96.039,00
1000–1500 ccRp 244.647,00Rp 133.677,00
1500–2000 ccRp 301.104,00Rp 190.134,00
2000–2500 ccRp 357.561,00Rp 246.591,00
> 2500 ccRp 432.837,00Rp 321.867,00

Estimated from typical combined fuel use by engine size and Pertamax (RON92) at Rp 12.300,00/L. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Related comparisons

Frequently asked questions

How much does it cost to charge a Tesla Model Y Long Range AWD from 20% to 80%?

Charging a Tesla Model Y Long Range AWD from 20% to 80% at a public DC fast charger costs about Rp 110.970,00.

How long does it take to charge a Tesla Model Y Long Range AWD?

Charging a Tesla Model Y Long Range AWD from 20% to 80% at a public DC fast charger takes about 25 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator