EV Charge Calculator

BYD Atto 3 Superior Charging Cost in Malaysia

By mht-dev, Frontend Engineer & Creator

Estimate the cost and time to charge a BYD Atto 3 Superior (full battery electric vehicle / BEV) in Malaysia, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.

BYD Atto 3 Superior specifications

Units
Usable battery capacity
60.5 kWh
DC fast-charge power (peak)
88 kW
AC charge power (onboard)
7 kW
Manufacturer-claimed range
420 km (WLTP)
Realistic range estimate
357 km

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
17 kWh/100 km

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
RM 7.53
Battery chemistry
LFP
Open in calculatorCompare cars

BYD Atto 3 Superior charging cost & time

BYD Atto 3 Superior charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%36.3 kWh33 minutesRM 50.80
Public DC 0% → 100%60.5 kWh1 hours 24 minutesRM 84.67
At home (AC) 20% → 80%36.3 kWh5 hours 11 minutesRM 16.12

BYD Atto 3 Superior charging time by charger power

How long the BYD Atto 3 Superior takes to charge at different charger power levels, capped by its own onboard limits.

BYD Atto 3 Superior charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%27 hours 29 minutes
Home wallbox7 kW0% → 100%8 hours 38 minutes
Public AC7 kW0% → 100%8 hours 38 minutes
DC fast88 kW10% → 80%38 minutes

AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.

The DC fast row (10% to 80%) is anchored to a measured charging time for this model, so it reflects the real charging curve. Times still vary with temperature and conditions.

Charging speed

Based on measured data, the BYD Atto 3 Superior charges 10% → 80% on DC fast charging in about 38 minutes, peaking at around 88 kW. EV Database Atto 3 (88 kW DC, MY market); modest LFP curve.

The BYD Atto 3 Superior is estimated to charge from 20% to 80% on public DC fast charging in about 33 minutes (standard DC).

As of 2026-05-29

Battery care

This car uses an LFP battery, which tolerates routine charging to 100%. Charging full now and then is fine and even helps the car read its charge level accurately.

Savings vs a petrol car

This charge adds about 214 km of range for RM 50.80. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 ccRM 23.44-RM 27.36
1000–1500 ccRM 27.71-RM 23.10
1500–2000 ccRM 34.10-RM 16.70
2000–2500 ccRM 40.49-RM 10.31
> 2500 ccRM 49.02-RM 1.78

Estimated from typical combined fuel use by engine size and RON95 (BUDI95) at RM 1.99/L. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Related comparisons

Frequently asked questions

How much does it cost to charge a BYD Atto 3 Superior from 20% to 80%?

Charging a BYD Atto 3 Superior from 20% to 80% at a public DC fast charger costs about RM 50.80.

How long does it take to charge a BYD Atto 3 Superior?

Charging a BYD Atto 3 Superior from 20% to 80% at a public DC fast charger takes about 33 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator