Mercedes-Benz EQA 250+ Charging Cost in Malaysia
By mht-dev, Frontend Engineer & Creator
Estimate the cost and time to charge a Mercedes-Benz EQA 250+ (full battery electric vehicle / BEV) in Malaysia, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.
Mercedes-Benz EQA 250+ specifications
- Usable battery capacity
- 70.5 kWh
- DC fast-charge power (peak)
- 100 kW
- AC charge power (onboard)
- 11 kW
- Manufacturer-claimed range
- 560 km (WLTP)
- Realistic range estimate
- 476 km
- Estimated efficiency
- 15 kWh/100 km
- Estimated charging cost per 100 km
- RM 6.58
- Battery chemistry
- NMC
A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.
Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.
Mercedes-Benz EQA 250+ charging cost & time
| Scenario | Energy | Time | Cost |
|---|---|---|---|
| Public DC 20% → 80% | 42.3 kWh | 31 minutes | RM 59.22 |
| Public DC 0% → 100% | 70.5 kWh | 1 hours 18 minutes | RM 98.70 |
| At home (AC) 20% → 80% | 42.3 kWh | 3 hours 51 minutes | RM 18.79 |
Mercedes-Benz EQA 250+ charging time by charger power
How long the Mercedes-Benz EQA 250+ takes to charge at different charger power levels, capped by its own onboard limits.
| Charger | Power | Charge | Time |
|---|---|---|---|
| Standard outlet | 2.2 kW | 0% → 100% | 32 hours 3 minutes |
| Home wallbox | 7 kW | 0% → 100% | 10 hours 4 minutes |
| Public AC | 11 kW | 0% → 100% | 6 hours 25 minutes |
| DC fast | 100 kW | 10% → 80% | 35 minutes |
AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.
The DC fast row (10% to 80%) is anchored to a measured charging time for this model, so it reflects the real charging curve. Times still vary with temperature and conditions.
Charging speed
Based on measured data, the Mercedes-Benz EQA 250+ charges 10% → 80% on DC fast charging in about 35 minutes, peaking at around 102 kW. Holds ~100 kW to ~50%, then earlier taper.
The Mercedes-Benz EQA 250+ is estimated to charge from 20% to 80% on public DC fast charging in about 31 minutes (fast DC).
As of 2026-05-26
Battery care
This car uses an NMC battery. For daily use, charging to about 80% and topping up to 100% only before long trips helps it last longer; heat is the main thing that ages it.
Savings vs a petrol car
This charge adds about 286 km of range for RM 59.22. Driving the same distance on petrol would cost:
| Engine size | Petrol cost | You save |
|---|---|---|
| ≤ 1000 cc | RM 31.26 | -RM 27.96 |
| 1000–1500 cc | RM 36.94 | -RM 22.28 |
| 1500–2000 cc | RM 45.47 | -RM 13.75 |
| 2000–2500 cc | RM 53.99 | -RM 5.23 |
| > 2500 cc | RM 65.36 | RM 6.14 |
Estimated from typical combined fuel use by engine size and RON95 (BUDI95) at RM 1.99/L. Charging at home saves the most; actual figures vary with driving and conditions.
Related vehicles
Compare with another car →Frequently asked questions
How much does it cost to charge a Mercedes-Benz EQA 250+ from 20% to 80%?
- Charging a Mercedes-Benz EQA 250+ from 20% to 80% at a public DC fast charger costs about RM 59.22.
How long does it take to charge a Mercedes-Benz EQA 250+?
- Charging a Mercedes-Benz EQA 250+ from 20% to 80% at a public DC fast charger takes about 31 minutes.