Zeekr 009 Executive Charging Cost in Malaysia
By mht-dev, Frontend Engineer & Creator
Estimate the cost and time to charge a Zeekr 009 Executive (full battery electric vehicle / BEV) in Malaysia, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.
Zeekr 009 Executive specifications
- Usable battery capacity
- 116 kWh
- DC fast-charge power (peak)
- 200 kW
- AC charge power (onboard)
- 22 kW
- Manufacturer-claimed range
- 604 km (WLTP)
- Realistic range estimate
- 513 km
- Estimated efficiency
- 23 kWh/100 km
- Estimated charging cost per 100 km
- RM 10.04
- Battery chemistry
- NMC
A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.
Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.
Zeekr 009 Executive charging cost & time
| Scenario | Energy | Time | Cost |
|---|---|---|---|
| Public DC 20% → 80% | 69.6 kWh | 25 minutes | RM 97.44 |
| Public DC 0% → 100% | 116 kWh | 1 hours 3 minutes | RM 162.40 |
| At home (AC) 20% → 80% | 69.6 kWh | 3 hours 10 minutes | RM 30.92 |
Zeekr 009 Executive charging time by charger power
How long the Zeekr 009 Executive takes to charge at different charger power levels, capped by its own onboard limits.
| Charger | Power | Charge | Time |
|---|---|---|---|
| Standard outlet | 2.2 kW | 0% → 100% | 52 hours 44 minutes |
| Home wallbox | 7 kW | 0% → 100% | 16 hours 34 minutes |
| Public AC | 22 kW | 0% → 100% | 5 hours 16 minutes |
| DC fast | 200 kW | 10% → 80% | 28 minutes |
AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.
The DC fast row (10% to 80%) models the charging curve tapering as the battery fills, so it is more realistic than a flat estimate. Real DC times still vary with temperature, battery state, and the charger.
Charging speed
The Zeekr 009 Executive is estimated to charge from 20% to 80% on public DC fast charging in about 25 minutes (ultra-fast DC).
Estimated. Real DC charging slows as the battery fills, so the time varies by model, temperature, and charger.
As of 2026-05-25
Battery care
This car uses an NMC battery. For daily use, charging to about 80% and topping up to 100% only before long trips helps it last longer; heat is the main thing that ages it.
Savings vs a petrol car
This charge adds about 308 km of range for RM 97.44. Driving the same distance on petrol would cost:
| Engine size | Petrol cost | You save |
|---|---|---|
| ≤ 1000 cc | RM 33.71 | -RM 63.73 |
| 1000–1500 cc | RM 39.84 | -RM 57.60 |
| 1500–2000 cc | RM 49.04 | -RM 48.40 |
| 2000–2500 cc | RM 58.23 | -RM 39.21 |
| > 2500 cc | RM 70.49 | -RM 26.95 |
Estimated from typical combined fuel use by engine size and RON95 (BUDI95) at RM 1.99/L. Charging at home saves the most; actual figures vary with driving and conditions.
Related vehicles
Compare with another car →Frequently asked questions
How much does it cost to charge a Zeekr 009 Executive from 20% to 80%?
- Charging a Zeekr 009 Executive from 20% to 80% at a public DC fast charger costs about RM 97.44.
How long does it take to charge a Zeekr 009 Executive?
- Charging a Zeekr 009 Executive from 20% to 80% at a public DC fast charger takes about 25 minutes.