Deepal S07 Charging Cost in Singapore
By mht-dev, Frontend Engineer & Creator
Estimate the cost and time to charge a Deepal S07 (full battery electric vehicle / BEV) in Singapore, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.
Deepal S07 specifications
- Usable battery capacity
- 80 kWh
- DC fast-charge power (peak)
- 92 kW
- AC charge power (onboard)
- 11 kW
- Manufacturer-claimed range
- 475 km (WLTP)
- Realistic range estimate
- 404 km
- Estimated efficiency
- 20 kWh/100 km
- Estimated charging cost per 100 km
- $5.89
- Battery chemistry
- LFP
A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.
Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.
Deepal S07 charging cost & time
| Scenario | Energy | Time | Cost |
|---|---|---|---|
| Public DC 20% → 80% | 48 kWh | 51 minutes | $36.95 |
| Public DC 0% → 100% | 80 kWh | 2 hours 9 minutes | $61.58 |
| At home (AC) 20% → 80% | 48 kWh | 4 hours 22 minutes | $14.26 |
Deepal S07 charging time by charger power
How long the Deepal S07 takes to charge at different charger power levels, capped by its own onboard limits.
| Charger | Power | Charge | Time |
|---|---|---|---|
| Standard outlet | 2.2 kW | 0% → 100% | 36 hours 21 minutes |
| Home wallbox | 7 kW | 0% → 100% | 11 hours 25 minutes |
| Public AC | 11 kW | 0% → 100% | 7 hours 16 minutes |
| DC fast | 92 kW | 10% → 80% | 58 minutes |
AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.
The DC fast row (10% to 80%) is anchored to a measured charging time for this model, so it reflects the real charging curve. Times still vary with temperature and conditions.
Charging speed
Based on measured data, the Deepal S07 charges 10% → 80% on DC fast charging in about 58 minutes, peaking at around 93 kW. Only ~93 kW peak - slow for a big battery.
The Deepal S07 is estimated to charge from 20% to 80% on public DC fast charging in about 51 minutes (standard DC).
As of 2026-05-26
Battery care
This car uses an LFP battery, which tolerates routine charging to 100%. Charging full now and then is fine and even helps the car read its charge level accurately.
Savings vs a petrol car
This charge adds about 242 km of range for $36.95. Driving the same distance on petrol would cost:
| Engine size | Petrol cost | You save |
|---|---|---|
| ≤ 1000 cc | $46.10 | $9.15 |
| 1000–1500 cc | $54.48 | $17.54 |
| 1500–2000 cc | $67.05 | $30.11 |
| 2000–2500 cc | $79.63 | $42.68 |
| > 2500 cc | $96.39 | $59.45 |
Estimated from typical combined fuel use by engine size and RON95 at $3.46/L. Charging at home saves the most; actual figures vary with driving and conditions.
Related vehicles
Compare with another car →Frequently asked questions
How much does it cost to charge a Deepal S07 from 20% to 80%?
- Charging a Deepal S07 from 20% to 80% at a public DC fast charger costs about $36.95.
How long does it take to charge a Deepal S07?
- Charging a Deepal S07 from 20% to 80% at a public DC fast charger takes about 51 minutes.