EV Charge Calculator

Tesla Model Y RWD (Cat A) Charging Cost in Singapore

By mht-dev, Frontend Engineer & Creator

Estimate the cost and time to charge a Tesla Model Y RWD (Cat A) (full battery electric vehicle / BEV) in Singapore, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.

Tesla Model Y RWD (Cat A) specifications

Units
Usable battery capacity
62.5 kWh
DC fast-charge power (peak)
175 kW
AC charge power (onboard)
11 kW
Manufacturer-claimed range
466 km (WLTP)
Realistic range estimate
396 km

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
16 kWh/100 km

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
$4.69
Battery chemistry
LFP
Open in calculatorCompare cars

Tesla Model Y RWD (Cat A) charging cost & time

Tesla Model Y RWD (Cat A) charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%37.5 kWh24 minutes$28.88
Public DC 0% → 100%62.5 kWh1 hours$48.13
At home (AC) 20% → 80%37.5 kWh3 hours 25 minutes$11.15

Tesla Model Y RWD (Cat A) charging time by charger power

How long the Tesla Model Y RWD (Cat A) takes to charge at different charger power levels, capped by its own onboard limits.

Tesla Model Y RWD (Cat A) charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%28 hours 25 minutes
Home wallbox7 kW0% → 100%8 hours 56 minutes
Public AC11 kW0% → 100%5 hours 41 minutes
DC fast175 kW10% → 80%27 minutes

AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.

The DC fast row (10% to 80%) is anchored to a measured charging time for this model, so it reflects the real charging curve. Times still vary with temperature and conditions.

Charging speed

Based on measured data, the Tesla Model Y RWD (Cat A) charges 10% → 80% on DC fast charging in about 27 minutes, peaking at around 175 kW. Juniper LFP; Supercharger V3+. Cat-A 110 kW motor cap does not limit DC charging.

The Tesla Model Y RWD (Cat A) is estimated to charge from 20% to 80% on public DC fast charging in about 24 minutes (ultra-fast DC).

As of 2026-05-29

Battery care

This car uses an LFP battery, which tolerates routine charging to 100%. Charging full now and then is fine and even helps the car read its charge level accurately.

Savings vs a petrol car

This charge adds about 238 km of range for $28.88. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 cc$45.23$16.35
1000–1500 cc$53.45$24.57
1500–2000 cc$65.78$36.91
2000–2500 cc$78.12$49.24
> 2500 cc$94.56$65.69

Estimated from typical combined fuel use by engine size and RON95 at $3.46/L. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Frequently asked questions

How much does it cost to charge a Tesla Model Y RWD (Cat A) from 20% to 80%?

Charging a Tesla Model Y RWD (Cat A) from 20% to 80% at a public DC fast charger costs about $28.88.

How long does it take to charge a Tesla Model Y RWD (Cat A)?

Charging a Tesla Model Y RWD (Cat A) from 20% to 80% at a public DC fast charger takes about 24 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator