Nissan Ariya Venture+ Charging Cost in United States
By mht-dev, Frontend Engineer & Creator
Estimate the cost and time to charge a Nissan Ariya Venture+ (full battery electric vehicle / BEV) in United States, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.
Nissan Ariya Venture+ specifications
- Usable battery capacity
- 87 kWh
- DC fast-charge power (peak)
- 130 kW
- AC charge power (onboard)
- 7.2 kW
- Manufacturer-claimed range
- 289 mi (EPA)
- Realistic range estimate
- 289 mi
- Estimated efficiency
- 3.3 mi/kWh
- Estimated charging cost per 100 km
- $3.37
- Battery chemistry
- NMC
A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.
Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.
Nissan Ariya Venture+ charging cost & time
| Scenario | Energy | Time | Cost |
|---|---|---|---|
| Public DC 20% → 80% | 52.2 kWh | 24 minutes | $25.06 |
| Public DC 0% → 100% | 87 kWh | 40 minutes | $41.76 |
| At home (AC) 20% → 80% | 52.2 kWh | 7 hours 15 minutes | $9.40 |
Nissan Ariya Venture+ charging time by charger power
How long the Nissan Ariya Venture+ takes to charge at different charger power levels, capped by its own onboard limits.
| Charger | Power | Charge | Time |
|---|---|---|---|
| Standard outlet | 2.2 kW | 0% → 100% | 39 hours 33 minutes |
| Home wallbox | 7 kW | 0% → 100% | 12 hours 26 minutes |
| Public AC | 7.2 kW | 0% → 100% | 12 hours 5 minutes |
| DC fast | 130 kW | 10% → 80% | 28 minutes |
Estimates assume constant charging power. AC rows charge 0% to 100%; the DC row charges 10% to 80% (DC speed tapers near full). Real times can be longer.
Charging speed
The Nissan Ariya Venture+ is estimated to charge from 20% to 80% on public DC fast charging in about 24 minutes (fast DC).
Estimate: assumes constant charging power; real-world time can be longer as the charging curve tapers near full.
As of 2026-05-27
Battery care
This car uses an NMC battery. For daily use, charging to about 80% and topping up to 100% only before long trips helps it last longer; heat is the main thing that ages it.
Savings vs a petrol car
This charge adds about 173 mi of range for $25.06. Driving the same distance on petrol would cost:
| Engine size | Petrol cost | You save |
|---|---|---|
| ≤ 1000 cc | $13.38 | -$11.68 |
| 1000–1500 cc | $15.81 | -$9.25 |
| 1500–2000 cc | $19.46 | -$5.60 |
| 2000–2500 cc | $23.10 | -$1.95 |
| > 2500 cc | $27.97 | $2.91 |
Estimated from typical combined fuel use by engine size and Regular gasoline at $3.30/gal. Charging at home saves the most; actual figures vary with driving and conditions.
Related vehicles
Compare with another car →Frequently asked questions
How much does it cost to charge a Nissan Ariya Venture+ from 20% to 80%?
- Charging a Nissan Ariya Venture+ from 20% to 80% at a public DC fast charger costs about $25.06.
How long does it take to charge a Nissan Ariya Venture+?
- Charging a Nissan Ariya Venture+ from 20% to 80% at a public DC fast charger takes about 24 minutes.