Polestar 2 Long Range Single Motor Charging Cost in United States
By mht-dev, Frontend Engineer & Creator
Estimate the cost and time to charge a Polestar 2 Long Range Single Motor (full battery electric vehicle / BEV) in United States, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.
Polestar 2 Long Range Single Motor specifications
- Usable battery capacity
- 79 kWh
- DC fast-charge power (peak)
- 205 kW
- AC charge power (onboard)
- 11 kW
- Manufacturer-claimed range
- 320 mi (EPA)
- Realistic range estimate
- 320 mi
- Estimated efficiency
- 4.1 mi/kWh
- Estimated charging cost per 100 km
- $2.76
- Battery chemistry
- NMC
A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.
Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.
Polestar 2 Long Range Single Motor charging cost & time
| Scenario | Energy | Time | Cost |
|---|---|---|---|
| Public DC 20% → 80% | 47.4 kWh | 14 minutes | $22.75 |
| Public DC 0% → 100% | 79 kWh | 23 minutes | $37.92 |
| At home (AC) 20% → 80% | 47.4 kWh | 4 hours 19 minutes | $8.53 |
Polestar 2 Long Range Single Motor charging time by charger power
How long the Polestar 2 Long Range Single Motor takes to charge at different charger power levels, capped by its own onboard limits.
| Charger | Power | Charge | Time |
|---|---|---|---|
| Standard outlet | 2.2 kW | 0% → 100% | 35 hours 55 minutes |
| Home wallbox | 7 kW | 0% → 100% | 11 hours 17 minutes |
| Public AC | 11 kW | 0% → 100% | 7 hours 11 minutes |
| DC fast | 205 kW | 10% → 80% | 16 minutes |
Estimates assume constant charging power. AC rows charge 0% to 100%; the DC row charges 10% to 80% (DC speed tapers near full). Real times can be longer.
Charging speed
The Polestar 2 Long Range Single Motor is estimated to charge from 20% to 80% on public DC fast charging in about 14 minutes (ultra-fast DC).
Estimate: assumes constant charging power; real-world time can be longer as the charging curve tapers near full.
As of 2026-05-27
Battery care
This car uses an NMC battery. For daily use, charging to about 80% and topping up to 100% only before long trips helps it last longer; heat is the main thing that ages it.
Savings vs a petrol car
This charge adds about 192 mi of range for $22.75. Driving the same distance on petrol would cost:
| Engine size | Petrol cost | You save |
|---|---|---|
| ≤ 1000 cc | $14.81 | -$7.94 |
| 1000–1500 cc | $17.51 | -$5.24 |
| 1500–2000 cc | $21.55 | -$1.20 |
| 2000–2500 cc | $25.59 | $2.84 |
| > 2500 cc | $30.98 | $8.22 |
Estimated from typical combined fuel use by engine size and Regular gasoline at $3.30/gal. Charging at home saves the most; actual figures vary with driving and conditions.
Related vehicles
Compare with another car →Frequently asked questions
How much does it cost to charge a Polestar 2 Long Range Single Motor from 20% to 80%?
- Charging a Polestar 2 Long Range Single Motor from 20% to 80% at a public DC fast charger costs about $22.75.
How long does it take to charge a Polestar 2 Long Range Single Motor?
- Charging a Polestar 2 Long Range Single Motor from 20% to 80% at a public DC fast charger takes about 14 minutes.