EV Charge Calculator

Polestar 2 Long Range Single Motor Charging Cost in United States

By mht-dev, Frontend Engineer & Creator

Estimate the cost and time to charge a Polestar 2 Long Range Single Motor (full battery electric vehicle / BEV) in United States, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.

Polestar 2 Long Range Single Motor specifications

Usable battery capacity
79 kWh
DC fast-charge power (peak)
205 kW
AC charge power (onboard)
11 kW
Manufacturer-claimed range
320 mi (EPA)
Realistic range estimate
320 mi

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
4.1 mi/kWh

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
$2.76
Battery chemistry
NMC

Polestar 2 Long Range Single Motor charging cost & time

Polestar 2 Long Range Single Motor charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%47.4 kWh14 minutes$22.75
Public DC 0% → 100%79 kWh23 minutes$37.92
At home (AC) 20% → 80%47.4 kWh4 hours 19 minutes$8.53

Polestar 2 Long Range Single Motor charging time by charger power

How long the Polestar 2 Long Range Single Motor takes to charge at different charger power levels, capped by its own onboard limits.

Polestar 2 Long Range Single Motor charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%35 hours 55 minutes
Home wallbox7 kW0% → 100%11 hours 17 minutes
Public AC11 kW0% → 100%7 hours 11 minutes
DC fast205 kW10% → 80%16 minutes

Estimates assume constant charging power. AC rows charge 0% to 100%; the DC row charges 10% to 80% (DC speed tapers near full). Real times can be longer.

Charging speed

The Polestar 2 Long Range Single Motor is estimated to charge from 20% to 80% on public DC fast charging in about 14 minutes (ultra-fast DC).

Estimate: assumes constant charging power; real-world time can be longer as the charging curve tapers near full.

As of 2026-05-27

Battery care

This car uses an NMC battery. For daily use, charging to about 80% and topping up to 100% only before long trips helps it last longer; heat is the main thing that ages it.

Savings vs a petrol car

This charge adds about 192 mi of range for $22.75. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 cc$14.81-$7.94
1000–1500 cc$17.51-$5.24
1500–2000 cc$21.55-$1.20
2000–2500 cc$25.59$2.84
> 2500 cc$30.98$8.22

Estimated from typical combined fuel use by engine size and Regular gasoline at $3.30/gal. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Frequently asked questions

How much does it cost to charge a Polestar 2 Long Range Single Motor from 20% to 80%?

Charging a Polestar 2 Long Range Single Motor from 20% to 80% at a public DC fast charger costs about $22.75.

How long does it take to charge a Polestar 2 Long Range Single Motor?

Charging a Polestar 2 Long Range Single Motor from 20% to 80% at a public DC fast charger takes about 14 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator