EV Charge Calculator

Chevrolet Silverado EV LT Charging Cost in Canada

By mht-dev, Frontend Engineer & Creator

Estimate the cost and time to charge a Chevrolet Silverado EV LT (full battery electric vehicle / BEV) in Canada, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.

Chevrolet Silverado EV LT specifications

Units
Usable battery capacity
170 kWh
DC fast-charge power (peak)
350 kW
AC charge power (onboard)
11.5 kW
Manufacturer-claimed range
636 km (EPA)
Realistic range estimate
636 km

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
27 kWh/100 km

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
$4.54
Battery chemistry
NMC
Open in calculatorCompare cars

Chevrolet Silverado EV LT charging cost & time

Chevrolet Silverado EV LT charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%102 kWh21 minutes$45.90
Public DC 0% → 100%170 kWh53 minutes$76.50
At home (AC) 20% → 80%102 kWh8 hours 52 minutes$17.34

Chevrolet Silverado EV LT charging time by charger power

How long the Chevrolet Silverado EV LT takes to charge at different charger power levels, capped by its own onboard limits.

Chevrolet Silverado EV LT charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%77 hours 16 minutes
Home wallbox7 kW0% → 100%24 hours 17 minutes
Public AC11.5 kW0% → 100%14 hours 47 minutes
DC fast350 kW10% → 80%24 minutes

AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.

The DC fast row (10% to 80%) models the charging curve tapering as the battery fills, so it is more realistic than a flat estimate. Real DC times still vary with temperature, battery state, and the charger.

Charging speed

The Chevrolet Silverado EV LT is estimated to charge from 20% to 80% on public DC fast charging in about 21 minutes (ultra-fast DC).

Estimated. Real DC charging slows as the battery fills, so the time varies by model, temperature, and charger.

As of 2026-06-04

Battery care

This car uses an NMC battery. For daily use, charging to about 80% and topping up to 100% only before long trips helps it last longer; heat is the main thing that ages it.

Savings vs a petrol car

This charge adds about 382 km of range for $45.90. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 cc$40.51-$5.39
1000–1500 cc$47.87$1.97
1500–2000 cc$58.92$13.02
2000–2500 cc$69.97$24.07
> 2500 cc$84.70$38.80

Estimated from typical combined fuel use by engine size and Regular unleaded at $1.93/L. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Frequently asked questions

How much does it cost to charge a Chevrolet Silverado EV LT from 20% to 80%?

Charging a Chevrolet Silverado EV LT from 20% to 80% at a public DC fast charger costs about $45.90.

How long does it take to charge a Chevrolet Silverado EV LT?

Charging a Chevrolet Silverado EV LT from 20% to 80% at a public DC fast charger takes about 21 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator