Toyota C-HR SE FWD (77 kWh) Charging Cost in Canada
By mht-dev, Frontend Engineer & Creator
Estimate the cost and time to charge a Toyota C-HR SE FWD (77 kWh) (full battery electric vehicle / BEV) in Canada, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.
Toyota C-HR SE FWD (77 kWh) specifications
- Usable battery capacity
- 72 kWh
- DC fast-charge power (peak)
- 150 kW
- AC charge power (onboard)
- 11 kW
- Manufacturer-claimed range
- 496 km (EPA)
- Realistic range estimate
- 496 km
- Estimated efficiency
- 15 kWh/100 km
- Estimated charging cost per 100 km
- $2.47
- Battery chemistry
- NMC
A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.
Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.
Toyota C-HR SE FWD (77 kWh) charging cost & time
| Scenario | Energy | Time | Cost |
|---|---|---|---|
| Public DC 20% → 80% | 43.2 kWh | 25 minutes | $19.44 |
| Public DC 0% → 100% | 72 kWh | 1 hours 4 minutes | $32.40 |
| At home (AC) 20% → 80% | 43.2 kWh | 3 hours 56 minutes | $7.34 |
Toyota C-HR SE FWD (77 kWh) charging time by charger power
How long the Toyota C-HR SE FWD (77 kWh) takes to charge at different charger power levels, capped by its own onboard limits.
| Charger | Power | Charge | Time |
|---|---|---|---|
| Standard outlet | 2.2 kW | 0% → 100% | 32 hours 44 minutes |
| Home wallbox | 7 kW | 0% → 100% | 10 hours 17 minutes |
| Public AC | 11 kW | 0% → 100% | 6 hours 33 minutes |
| DC fast | 150 kW | 10% → 80% | 29 minutes |
AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.
The DC fast row (10% to 80%) is anchored to a measured charging time for this model, so it reflects the real charging curve. Times still vary with temperature and conditions.
Charging speed
Based on measured data, the Toyota C-HR SE FWD (77 kWh) charges 10% → 80% on DC fast charging in about 29 minutes, peaking at around 150 kW. ev-DB car/3394 = Toyota C-HR+ 77 kWh -- NEW BEV C-HR for CA 2026 (on sale spring 2026); 72 usable / 77 gross.
The Toyota C-HR SE FWD (77 kWh) is estimated to charge from 20% to 80% on public DC fast charging in about 25 minutes (ultra-fast DC).
As of 2026-06-04
Battery care
This car uses an NMC battery. For daily use, charging to about 80% and topping up to 100% only before long trips helps it last longer; heat is the main thing that ages it.
Savings vs a petrol car
This charge adds about 298 km of range for $19.44. Driving the same distance on petrol would cost:
| Engine size | Petrol cost | You save |
|---|---|---|
| ≤ 1000 cc | $31.59 | $12.15 |
| 1000–1500 cc | $37.33 | $17.89 |
| 1500–2000 cc | $45.95 | $26.51 |
| 2000–2500 cc | $54.56 | $35.12 |
| > 2500 cc | $66.05 | $46.61 |
Estimated from typical combined fuel use by engine size and Regular unleaded at $1.93/L. Charging at home saves the most; actual figures vary with driving and conditions.
Related vehicles
Compare with another car →Frequently asked questions
How much does it cost to charge a Toyota C-HR SE FWD (77 kWh) from 20% to 80%?
- Charging a Toyota C-HR SE FWD (77 kWh) from 20% to 80% at a public DC fast charger costs about $19.44.
How long does it take to charge a Toyota C-HR SE FWD (77 kWh)?
- Charging a Toyota C-HR SE FWD (77 kWh) from 20% to 80% at a public DC fast charger takes about 25 minutes.