EV Charge Calculator

Proton e.MAS 7 Prime Charging Cost in Malaysia

By mht-dev, Frontend Engineer & Creator

Estimate the cost and time to charge a Proton e.MAS 7 Prime (full battery electric vehicle / BEV) in Malaysia, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.

Proton e.MAS 7 Prime specifications

Units
Usable battery capacity
49.5 kWh
DC fast-charge power (peak)
80 kW
AC charge power (onboard)
11 kW
Manufacturer-claimed range
345 km (WLTP)
Realistic range estimate
293 km

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
17 kWh/100 km

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
RM 7.50
Battery chemistry
LFP
Open in calculatorCompare cars

Proton e.MAS 7 Prime charging cost & time

Proton e.MAS 7 Prime charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%29.7 kWh27 minutesRM 41.60
Public DC 0% → 100%49.5 kWh1 hours 7 minutesRM 69.33
At home (AC) 20% → 80%29.7 kWh2 hours 42 minutesRM 13.20

Proton e.MAS 7 Prime charging time by charger power

How long the Proton e.MAS 7 Prime takes to charge at different charger power levels, capped by its own onboard limits.

Proton e.MAS 7 Prime charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%22 hours 31 minutes
Home wallbox7 kW0% → 100%7 hours 4 minutes
Public AC11 kW0% → 100%4 hours 30 minutes
DC fast80 kW10% → 80%30 minutes

AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.

The DC fast row (10% to 80%) models the charging curve tapering as the battery fills, so it is more realistic than a flat estimate. Real DC times still vary with temperature, battery state, and the charger.

Charging speed

The Proton e.MAS 7 Prime is estimated to charge from 20% to 80% on public DC fast charging in about 27 minutes (standard DC).

Estimated. Real DC charging slows as the battery fills, so the time varies by model, temperature, and charger.

As of 2026-05-25

Battery care

This car uses an LFP battery, which tolerates routine charging to 100%. Charging full now and then is fine and even helps the car read its charge level accurately.

Savings vs a petrol car

This charge adds about 176 km of range for RM 41.60. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 ccRM 19.26-RM 22.34
1000–1500 ccRM 22.76-RM 18.84
1500–2000 ccRM 28.01-RM 13.59
2000–2500 ccRM 33.26-RM 8.33
> 2500 ccRM 40.27-RM 1.33

Estimated from typical combined fuel use by engine size and RON95 (BUDI95) at RM 1.99/L. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Related comparisons

Frequently asked questions

How much does it cost to charge a Proton e.MAS 7 Prime from 20% to 80%?

Charging a Proton e.MAS 7 Prime from 20% to 80% at a public DC fast charger costs about RM 41.60.

How long does it take to charge a Proton e.MAS 7 Prime?

Charging a Proton e.MAS 7 Prime from 20% to 80% at a public DC fast charger takes about 27 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator