EV Charge Calculator

Proton e.MAS 7 Premium Charging Cost in Malaysia

By mht-dev, Frontend Engineer & Creator

Estimate the cost and time to charge a Proton e.MAS 7 Premium (full battery electric vehicle / BEV) in Malaysia, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.

Proton e.MAS 7 Premium specifications

Units
Usable battery capacity
60.2 kWh
DC fast-charge power (peak)
100 kW
AC charge power (onboard)
11 kW
Manufacturer-claimed range
410 km (WLTP)
Realistic range estimate
349 km

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
17 kWh/100 km

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
RM 7.68
Battery chemistry
LFP
Open in calculatorCompare cars

Proton e.MAS 7 Premium charging cost & time

Proton e.MAS 7 Premium charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%36.1 kWh26 minutesRM 50.58
Public DC 0% → 100%60.2 kWh1 hours 5 minutesRM 84.31
At home (AC) 20% → 80%36.1 kWh3 hours 17 minutesRM 16.05

Proton e.MAS 7 Premium charging time by charger power

How long the Proton e.MAS 7 Premium takes to charge at different charger power levels, capped by its own onboard limits.

Proton e.MAS 7 Premium charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%27 hours 22 minutes
Home wallbox7 kW0% → 100%8 hours 36 minutes
Public AC11 kW0% → 100%5 hours 28 minutes
DC fast100 kW10% → 80%29 minutes

AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.

The DC fast row (10% to 80%) models the charging curve tapering as the battery fills, so it is more realistic than a flat estimate. Real DC times still vary with temperature, battery state, and the charger.

Charging speed

The Proton e.MAS 7 Premium is estimated to charge from 20% to 80% on public DC fast charging in about 26 minutes (fast DC).

Estimated. Real DC charging slows as the battery fills, so the time varies by model, temperature, and charger.

As of 2026-05-25

Battery care

This car uses an LFP battery, which tolerates routine charging to 100%. Charging full now and then is fine and even helps the car read its charge level accurately.

Savings vs a petrol car

This charge adds about 209 km of range for RM 50.58. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 ccRM 22.89-RM 27.70
1000–1500 ccRM 27.05-RM 23.54
1500–2000 ccRM 33.29-RM 17.30
2000–2500 ccRM 39.53-RM 11.05
> 2500 ccRM 47.85-RM 2.73

Estimated from typical combined fuel use by engine size and RON95 (BUDI95) at RM 1.99/L. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Related comparisons

Frequently asked questions

How much does it cost to charge a Proton e.MAS 7 Premium from 20% to 80%?

Charging a Proton e.MAS 7 Premium from 20% to 80% at a public DC fast charger costs about RM 50.58.

How long does it take to charge a Proton e.MAS 7 Premium?

Charging a Proton e.MAS 7 Premium from 20% to 80% at a public DC fast charger takes about 26 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator