Polestar 3 Long Range Single Motor specifications

Units
Usable battery capacity
111 kWh
DC fast-charge power (peak)
250 kW
AC charge power (onboard)
11 kW
Manufacturer-claimed range
706 km (WLTP)
Realistic range estimate
600 km

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
18 kWh/100 km

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
$5.50
Battery chemistry
NMC
Open in calculatorCompare cars

Polestar 3 Long Range Single Motor charging cost & time

Polestar 3 Long Range Single Motor charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%66.6 kWh30 minutes$51.28
Public DC 0% → 100%111 kWh1 hours 16 minutes$85.47
At home (AC) 20% → 80%66.6 kWh6 hours 3 minutes$19.79

Polestar 3 Long Range Single Motor charging time by charger power

How long the Polestar 3 Long Range Single Motor takes to charge at different charger power levels, capped by its own onboard limits.

Polestar 3 Long Range Single Motor charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%50 hours 27 minutes
Home wallbox7 kW0% → 100%15 hours 51 minutes
Public AC11 kW0% → 100%10 hours 5 minutes
DC fast250 kW10% → 80%34 minutes

AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.

The DC fast row (10% to 80%) is anchored to a measured charging time for this model, so it reflects the real charging curve. Times still vary with temperature and conditions.

Charging speed

Based on measured data, the Polestar 3 Long Range Single Motor charges 10% → 80% on DC fast charging in about 34 minutes, peaking at around 250 kW. 400V; 250 kW peak, ~132 kW average over 10→80%.

The Polestar 3 Long Range Single Motor is estimated to charge from 20% to 80% on public DC fast charging in about 30 minutes (ultra-fast DC).

As of 2026-05-29

Battery care

This car uses an NMC battery. For daily use, charging to about 80% and topping up to 100% only before long trips helps it last longer; heat is the main thing that ages it.

Savings vs a petrol car

This charge adds about 360 km of range for $51.28. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 cc$68.52$17.24
1000–1500 cc$80.98$29.70
1500–2000 cc$99.66$48.38
2000–2500 cc$118.35$67.07
> 2500 cc$143.27$91.99

Estimated from typical combined fuel use by engine size and RON95 at $3.46/L. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Frequently asked questions

How much does it cost to charge a Polestar 3 Long Range Single Motor from 20% to 80%?

Charging a Polestar 3 Long Range Single Motor from 20% to 80% at a public DC fast charger costs about $51.28.

How long does it take to charge a Polestar 3 Long Range Single Motor?

Charging a Polestar 3 Long Range Single Motor from 20% to 80% at a public DC fast charger takes about 30 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator