EV Charge Calculator

GAC Aion UT Standard Charging Cost in Indonesia

By mht-dev, Frontend Engineer & Creator

Estimate the cost and time to charge a GAC Aion UT Standard (full battery electric vehicle / BEV) in Indonesia, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.

GAC Aion UT Standard specifications

Units
Usable battery capacity
44,1 kWh
DC fast-charge power (peak)
64 kW
AC charge power (onboard)
6,6 kW
Manufacturer-claimed range
400 km (NEDC)
Realistic range estimate
288 km

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
15 kWh/100 km

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
Rp 26.035,86
Battery chemistry
LFP
Open in calculatorCompare cars

GAC Aion UT Standard charging cost & time

GAC Aion UT Standard charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%26,5 kWh30 minutesRp 65.279,95
Public DC 0% → 100%44,1 kWh1 hours 15 minutesRp 108.799,92
At home (AC) 20% → 80%26,5 kWh4 hours 1 minutesRp 44.989,96

GAC Aion UT Standard charging time by charger power

How long the GAC Aion UT Standard takes to charge at different charger power levels, capped by its own onboard limits.

GAC Aion UT Standard charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%20 hours 3 minutes
Home wallbox6.6 kW0% → 100%6 hours 41 minutes
Public AC6.6 kW0% → 100%6 hours 41 minutes
DC fast64 kW10% → 80%34 minutes

AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.

The DC fast row (10% to 80%) models the charging curve tapering as the battery fills, so it is more realistic than a flat estimate. Real DC times still vary with temperature, battery state, and the charger.

Charging speed

The GAC Aion UT Standard is estimated to charge from 20% to 80% on public DC fast charging in about 30 minutes (standard DC).

Estimated. Real DC charging slows as the battery fills, so the time varies by model, temperature, and charger.

As of 2026-05-24

Battery care

This car uses an LFP battery, which tolerates routine charging to 100%. Charging full now and then is fine and even helps the car read its charge level accurately.

Savings vs a petrol car

This charge adds about 173 km of range for Rp 65.279,95. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 ccRp 116.899,20Rp 51.619,25
1000–1500 ccRp 138.153,60Rp 72.873,65
1500–2000 ccRp 170.035,20Rp 104.755,25
2000–2500 ccRp 201.916,80Rp 136.636,85
> 2500 ccRp 244.425,60Rp 179.145,65

Estimated from typical combined fuel use by engine size and Pertamax (RON92) at Rp 12.300,00/L. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Frequently asked questions

How much does it cost to charge a GAC Aion UT Standard from 20% to 80%?

Charging a GAC Aion UT Standard from 20% to 80% at a public DC fast charger costs about Rp 65.279,95.

How long does it take to charge a GAC Aion UT Standard?

Charging a GAC Aion UT Standard from 20% to 80% at a public DC fast charger takes about 30 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator