EV Charge Calculator

Leapmotor B10 Life Charging Cost in Malaysia

By mht-dev, Frontend Engineer & Creator

Estimate the cost and time to charge a Leapmotor B10 Life (full battery electric vehicle / BEV) in Malaysia, calculated from its battery capacity and local electricity rates, both at public DC fast charging and at home.

Leapmotor B10 Life specifications

Units
Usable battery capacity
56.2 kWh
DC fast-charge power (peak)
140 kW
AC charge power (onboard)
11 kW
Manufacturer-claimed range
361 km (WLTP)
Realistic range estimate
307 km

A real-world estimate discounted from the manufacturer's claimed figure; actual distance depends on driving style, speed, and conditions.

Estimated efficiency
18 kWh/100 km

Estimated from the realistic range, not a measured consumption figure; actual use varies with driving and conditions.

Estimated charging cost per 100 km
RM 8.14
Battery chemistry
LFP
Open in calculatorCompare cars

Leapmotor B10 Life charging cost & time

Leapmotor B10 Life charging cost & time
ScenarioEnergyTimeCost
Public DC 20% → 80%33.7 kWh21 minutesRM 47.21
Public DC 0% → 100%56.2 kWh53 minutesRM 78.68
At home (AC) 20% → 80%33.7 kWh3 hours 4 minutesRM 14.98

Leapmotor B10 Life charging time by charger power

How long the Leapmotor B10 Life takes to charge at different charger power levels, capped by its own onboard limits.

Leapmotor B10 Life charging time by charger power
ChargerPowerChargeTime
Standard outlet2.2 kW0% → 100%25 hours 33 minutes
Home wallbox7 kW0% → 100%8 hours 2 minutes
Public AC11 kW0% → 100%5 hours 7 minutes
DC fast140 kW10% → 80%24 minutes

AC rows assume constant charging power and a 0% to 100% charge. Real times vary with the onboard charger, temperature, and the charger you use.

The DC fast row (10% to 80%) is anchored to a measured charging time for this model, so it reflects the real charging curve. Times still vary with temperature and conditions.

Charging speed

Based on measured data, the Leapmotor B10 Life charges 10% → 80% on DC fast charging in about 24 minutes, peaking at around 140 kW. LFP; 140 kW peak, steady taper.

The Leapmotor B10 Life is estimated to charge from 20% to 80% on public DC fast charging in about 21 minutes (fast DC).

As of 2026-05-26

Battery care

This car uses an LFP battery, which tolerates routine charging to 100%. Charging full now and then is fine and even helps the car read its charge level accurately.

Savings vs a petrol car

This charge adds about 184 km of range for RM 47.21. Driving the same distance on petrol would cost:

Engine sizePetrol costYou save
≤ 1000 ccRM 20.15-RM 27.06
1000–1500 ccRM 23.81-RM 23.39
1500–2000 ccRM 29.31-RM 17.90
2000–2500 ccRM 34.81-RM 12.40
> 2500 ccRM 42.13-RM 5.07

Estimated from typical combined fuel use by engine size and RON95 (BUDI95) at RM 1.99/L. Charging at home saves the most; actual figures vary with driving and conditions.

Related vehicles

Compare with another car →

Frequently asked questions

How much does it cost to charge a Leapmotor B10 Life from 20% to 80%?

Charging a Leapmotor B10 Life from 20% to 80% at a public DC fast charger costs about RM 47.21.

How long does it take to charge a Leapmotor B10 Life?

Charging a Leapmotor B10 Life from 20% to 80% at a public DC fast charger takes about 21 minutes.

Calculate for your car

Calculate charging cost for another car in the calculator